A prime factor of the production loss is a plan, and non-plan stop of equipment. However, if the equipment obstruction degree can be calculated, and the thing to restore large equipment of the obstruction degree prior be done, the obstruction degree can be made the most small. We developed a system that determines the recovery priority to improve production efficiency. The system obtains the instantaneous loss from changing work-in-process, calculates the optimum recovery priority in a short period based on the obtained value, and gives resource entry instructions to appropriate places.
引用
收藏
页码:85 / 88
相关论文
共 50 条
  • [41] Productivity modeling of semiconductor manufacturing equipment
    Pool, M
    Bachrach, R
    PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 1423 - 1427
  • [42] PRODUCTIVITY OF BED OPERATION AND WELL EQUIPMENT
    AFANASEV, VA
    BATURIN, YE
    ELIZAROV, AV
    MAKSIMOV, VP
    NEFTYANOE KHOZYAISTVO, 1979, (07): : 33 - 35
  • [43] Case study of obsolescence and equipment productivity
    Bhurisith, I
    Touran, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04): : 357 - 361
  • [44] VERSATILE DICTATION EQUIPMENT IMPROVES PRODUCTIVITY
    WALSHE, WA
    AMERICAN BAR ASSOCIATION JOURNAL, 1980, 66 (JAN): : 56 - 62
  • [45] Equipment investment, output and productivity in China
    Herrerias, M. J.
    Orts, Vicente
    EMPIRICAL ECONOMICS, 2012, 42 (01) : 181 - 207
  • [46] EQUIPMENT, PRODUCTIVITY AND QUALITY IN P/M
    PORTER, J
    INTERNATIONAL JOURNAL OF POWDER METALLURGY, 1993, 29 (01): : 13 - 14
  • [47] MULTIFACTOR PRODUCTIVITY IN FARM AND GARDEN EQUIPMENT
    FALK, E
    LITZ, D
    MONTHLY LABOR REVIEW, 1991, 114 (06) : 27 - 38
  • [48] Equipment investment, output and productivity in China
    M. J. Herrerias
    Vicente Orts
    Empirical Economics, 2012, 42 : 181 - 207
  • [49] Prioritizing transportation network recovery using a resilience measure
    Liu, YuanChi
    McNeil, Sue
    Hackl, Jurgen
    Adey, Bryan T.
    SUSTAINABLE AND RESILIENT INFRASTRUCTURE, 2022, 7 (01) : 70 - 81
  • [50] Prioritizing equipment for replacement mike capuano a plan based on data not perception
    Capuano, Mike
    Biomedical Instrumentation and Technology, 2010, 44 (02):