共 50 条
- [1] PRODUCTIVITY AND EQUIPMENT REMOVAL ENHANCEMENT USING PREDRIVEN LONGWALL RECOVERY ROOMS PROCEEDINGS : 1989 MULTINATIONAL CONFERENCE ON MINE PLANNING AND DESIGN, 1989, : 119 - 124
- [2] USE OF NITRITES TO OBTAIN AND MAINTAIN A VERY HIGH VACUUM IN THERMONUCLEAR EQUIPMENT INSTRUMENTS AND EXPERIMENTAL TECHNIQUES-USSR, 1970, (02): : 529 - +
- [3] An Integrated Failure Prioritizing Model of Complex Equipment JOURNAL OF GREY SYSTEM, 2015, 27 (03): : 39 - 50
- [4] NEW HIGH-PRODUCTIVITY EQUIPMENT TRANSFORMS CONVENTIONAL PROCESSING MODERN PLASTICS, 1980, 57 (12): : 52 - 54
- [5] DEVELOPMENT OF HIGH PRODUCTIVITY STACK GAS CUTTING EQUIPMENT. Welding in the World, Le Soudage Dans Le Monde, 1982, 20 (3-4): : 31 - 38
- [10] NEW DEVELOPMENT IN ION-IMPLANTATION AND RTP EQUIPMENT FOR HIGH PRODUCTIVITY NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 1989, 37-8 : 448 - 455