共 50 条
- [42] NEW BOND BOOSTS EFFICIENCY IN DRY TOOL AND CUTTER GRINDING INDUSTRIAL DIAMOND REVIEW, 1969, 29 (349): : 504 - &
- [48] PRODUCTIVITY GAINS WITH RAPID GRINDING SYSTEM. Australian machinery and production engineering, 1986, 38 (12 -v 39 n 1):
- [49] USE OF COMPUTERIZED INDIRECT LABOR REPORTING SYSTEM BOOSTS PRODUCTIVITY INDUSTRIAL ENGINEERING, 1982, 14 (08): : 46 - 49
- [50] Contribution to the Calculation of Maximum Possible Substitution of Coke by Oil While Preserving Unchanged Blast Furnace Productivity. Hutnicke Listy, 1977, 32 (05): : 312 - 316