Heuristic risk assessment using cost factors

被引:0
|
作者
Univ of Southern California, Los Angeles, United States [1 ]
机构
来源
IEEE Software | / 3卷 / 51-59期
关键词
Computational methods - Computer software - Cost accounting - Expert systems - Heuristic methods - Project management - Wide area networks;
D O I
暂无
中图分类号
学科分类号
摘要
Risk management practices may improved by leveraging on existing knowledge and expertise during cost estimation activities through the use of cost factors to detect patterns of project risk. The technique is an extension of the Constructive Cost Model (Cocomo) which supports project planning by identifying, categorizing, quantifying, and prioritizing project risks. The method described is encapsulated in a tool called Expert Cocomo II, and is intended to be used in conjunction with other management techniques. The extended method also detects cost estimate input anomalies and provides risk control advice in addition to conventional Cocomo cost and schedule calculation.
引用
收藏
相关论文
共 50 条
  • [21] Risk factors and risk assessment in menopause
    Oppelt, PG
    Beckmann, MW
    GEBURTSHILFE UND FRAUENHEILKUNDE, 2001, 61 (05) : 257 - 267
  • [22] Cardiovascular Risk Factors and Risk Assessment
    Schreiber, Christian
    JOURNAL FUR KARDIOLOGIE, 2008, 15 (7-8): : 266 - 266
  • [23] Risk Assessment in Costing Systems Using Costing at Risk (CaR): An Application to the Coffee Production Cost
    Jimenez, V.
    Afonso, P.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1315 - 1319
  • [24] Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic
    Jude Iloabuchi Obianyo
    Okey Enangha Okey
    George Uwadiegwu Alaneme
    Innovative Infrastructure Solutions, 2022, 7
  • [25] Assessment of cost overrun factors in construction projects in Nigeria using fuzzy logic
    Obianyo, Jude Iloabuchi
    Okey, Okey Enangha
    Alaneme, George Uwadiegwu
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (05)
  • [26] Global risk factors and the cost of capital
    Koedijk, KG
    van Dijk, MA
    FINANCIAL ANALYSTS JOURNAL, 2004, 60 (02) : 32 - 38
  • [27] Cost-effectiveness/risk factors
    Webb, KH
    PEDIATRICS, 2000, 106 (02) : 377 - 378
  • [28] Minimum cost path determination using a simple heuristic function
    Wink, O
    Niessen, WJ
    Viergever, MA
    15TH INTERNATIONAL CONFERENCE ON PATTERN RECOGNITION, VOL 3, PROCEEDINGS: IMAGE, SPEECH AND SIGNAL PROCESSING, 2000, : 998 - 1001
  • [29] Cost and Load Reduction using Heuristic Algorithms in Smart Grid
    Iqbal, Zafar
    Javaid, Nadeem
    Khan, Mobushir Riaz
    Ahmed, Imran
    Khan, Zahoor Ali
    Qasim, Umar
    IEEE 30TH INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION NETWORKING AND APPLICATIONS WORKSHOPS (WAINA 2016), 2016, : 24 - 30
  • [30] Cost assessment for ergonomic risk (CAFER)
    Barsky, I
    Dutta, SP
    INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 1997, 20 (04) : 307 - 315