Erection of the Steam-Generating Plant of Two Units.

被引:0
|
作者
Grgic, Anto [1 ]
机构
[1] OOUR Inzenjering, INA-Projekt,, Zagreb, Yugosl, OOUR Inzenjering, INA-Projekt, Zagreb, Yugosl
来源
| 1600年 / 27期
关键词
CONSTRUCTION TIME DURATION - ERECTION PLANNING;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] STEAM-GENERATING HEAVY-WATER REACTOR
    DANNATT, PC
    [J]. CHEMICAL ENGINEER-LONDON, 1975, (296): : 232 - 234
  • [32] DIRECT-CYCLE STEAM-GENERATING BLANKET DESIGN
    CORT, GE
    HAGENSON, RL
    KRAKOWSKI, RA
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 33 (NOV): : 76 - 77
  • [33] EVALUATION OF POWER AND STEAM-GENERATING ALTERNATIVES IN KRAFT MILLS
    BALDUS, RF
    EDWARDS, LL
    [J]. TAPPI, 1978, 61 (09): : 77 - 79
  • [34] Determination of steam wetness in the steam-generating equipment of nuclear power plants
    Gorburov V.I.
    Gorburov D.V.
    Kuz'min A.V.
    [J]. Thermal Engineering, 2012, 59 (05) : 390 - 394
  • [35] DEVELOPMENT AND APPLICATION OF SELF-OPTIMISING CONTROL TO COAL-FIRED STEAM-GENERATING PLANT
    MORAN, F
    BERGER, CS
    XIROKOSTAS, D
    [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1968, 115 (02): : 307 - +
  • [36] INVESTIGATIONS INTO BURNOUT MECHANISM IN STEAM-GENERATING TUBES.
    Doroschuk, V.E.
    Levitan, L.L.
    Lantzman, E.P.
    Nigmatulin, R.I.
    Borevsky, L.Ya.
    [J]. 1978,
  • [37] STRUCTURAL-ANALYSIS OF THE BRUCE - A STEAM-GENERATING SYSTEM
    TEPER, WW
    VIJAY, DK
    KOZLUK, MJ
    HO, SS
    [J]. MECHANICAL ENGINEERING, 1984, 106 (09): : 116 - 116
  • [38] Study of Large, Rapid Load Variations in Conventional Steam Power Plant Units.
    Dibelius, G.
    Gebhardt, A.
    [J]. VGB-Kraftwerkstechnik, 1986, 66 (05): : 433 - 439
  • [39] RADIAL TRANSFER OF MOMENTUM AND HEAT IN STEAM-GENERATING TUBES
    BEZRUKOV, EK
    KURMAZ, VF
    MIROPOLS.ZL
    [J]. THERMAL ENGINEERING, 1974, 21 (02) : 99 - 102
  • [40] 'Steam-generating plants-1999' VGB Conference
    Anon
    [J]. Teploenergetika, 1999, 46 (05):