共 50 条
- [45] Recovery of zinc from arduous wastes using solvent extraction technique Part II. Pilot plant tests PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2011, 47 : 249 - 258
- [46] Recovery of zinc and manganese from Bunker Hill Water Treatment Plant sludge: Part II - Electrowinning process development SECOND INTERNATIONAL SYMPOSIUM ON EXTRACTION AND PROCESSING FOR THE TREATMENT AND MINIMIZATION OF WASTES - 1996, 1996, : 719 - 729
- [48] Process for producing cement clinker based on LD slags with simultaneous metal recovery; Part 2: Plant design for industrial implementation of the clinkering of LD slags and recovery of the metal 1600, Verlag Bau und Technik GmbH (18): : 38 - 49