Simultaneous recovery of Pb and PbO2 from battery plant effluents. Part II

被引:0
|
作者
机构
[1] Brandon, N.P.
[2] 1,Pilone, D.
[3] Kelsall, G.H.
[4] Yin, Q.
来源
Kelsall, G.H. (g.kelsall@ic.ac.uk) | 1600年 / Kluwer Academic Publishers卷 / 33期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Copper, Zinc, and Lead Recovery from Jarosite Pb-Ag Tailings Waste (Part 2)
    Conic, Vesna
    Janosevic, Milos
    Bozic, Dragana S.
    Avramovic, Ljiljana
    Jovanovic, Ivana
    Bugarin, Dejan M.
    Dordievski, Stefan
    MINERALS, 2024, 14 (08)
  • [42] Simultaneous electrochemical degradation of pesticides from the aqueous environment using Ti/SnO2-Sb2O3/PbO2/Bi electrode; process modeling and mechanism insight
    Dolatabadi, Maryam
    Ehrampoush, Mohammad Hassan
    Pournamdari, Mostafa
    Ebrahimi, Ali Asghar
    Fallahzadeh, Hossein
    Ahmadzadeh, Saeid
    CHEMOSPHERE, 2023, 311
  • [43] DISCOVERY OF A SHOCK-INDUCED POLYMORPH OF RUTILE WITH α-PbO2 STRUCTURE (TiO2II) IN FOUR NEOARCHEAN SPHERULE LAYERS FROM WESTERN AUSTRALIA AND SOUTH AFRICA
    Smith, F. C.
    Zullo, J. B.
    Glass, B. P.
    Simonson, B. M.
    METEORITICS & PLANETARY SCIENCE, 2010, 45 : A192 - A192
  • [44] Cathodic hydrogen production by simultaneous oxidation of methyl red and 2,4-dichlorophenoxyacetate in aqueous solutions using PbO2, Sb-doped SnO2 and Si/BDD anodes. Part 2: hydrogen production
    Santos, Jose Eudes L.
    da Silva, Djalma R.
    Martinez-Huitle, Carlos A.
    dos Santos, Elisama Vieira
    Quiroz, Marco A.
    RSC ADVANCES, 2020, 10 (62) : 37947 - 37955
  • [45] Recovery of zinc from arduous wastes using solvent extraction technique Part II. Pilot plant tests
    Gotfryd, Leszek
    Chmielarz, Andrzej
    Szolomicki, Zbigniew
    PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2011, 47 : 249 - 258
  • [46] Recovery of zinc and manganese from Bunker Hill Water Treatment Plant sludge: Part II - Electrowinning process development
    Binsfield, MC
    Pesic, B
    Storhok, VC
    SECOND INTERNATIONAL SYMPOSIUM ON EXTRACTION AND PROCESSING FOR THE TREATMENT AND MINIMIZATION OF WASTES - 1996, 1996, : 719 - 729
  • [47] Potential for the Recovery of Selected Metals and Critical Raw Materials from Slags from Polymineral Zn-Pb Ore Metallurgy-Part II
    Swinder, Henryk
    Lejwoda, Pawel
    Krawczyk, Piotr
    Cempa, Magdalena
    Bauerek, Arkadiusz
    MINERALS, 2024, 14 (11)
  • [48] Process for producing cement clinker based on LD slags with simultaneous metal recovery; Part 2: Plant design for industrial implementation of the clinkering of LD slags and recovery of the metal
    Prozess zur Herstellung von Zementklinker auf Basis von LD-Schlacken bei gleichzeitiger Metallrückgewinnung
    Teil 2: Anlagenkonzeption zur technologischen Umsetzung der Verklinkerung von LD-Schlacken und der Metallrückgewinnung
    1600, Verlag Bau und Technik GmbH (18): : 38 - 49
  • [49] Genetically engineered Escherichia coli FBR5: Part II. Ethanol production from xylose and simultaneous product recovery
    Qureshi, N.
    Dien, B. S.
    Liu, S.
    Saha, B. C.
    Cotta, M. A.
    Hughes, S.
    Hector, R.
    BIOTECHNOLOGY PROGRESS, 2012, 28 (05) : 1179 - 1185
  • [50] Two-step recovery of Pb(II) and Cd(II) with thiophene functionalized hydrogel from lead-acid battery wastewater: Insight into pH-regulated separation
    Jiang, Yanni
    Lu, Lingxiao
    Liu, Zifan
    Zhang, Weiguo
    Liu, Fuqiang
    Li, Aimin
    SEPARATION AND PURIFICATION TECHNOLOGY, 2025, 354