共 50 条
- [25] Controlling Bacteria in Recycled Production Water for Completion and Workover Operations SPE PRODUCTION & OPERATIONS, 2010, 25 (02): : 232 - 240
- [26] DYNAMIC BUCKLING OF COILED TUBING DURING A COMPLETION/WORKOVER APPLICATION PROCEEDINGS OF THE ASME 29TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING 2010, VOL 5, PTS A AND B, 2010, : 37 - 48
- [28] Well workover equipment and technology improvements NEFTYANOE KHOZYAISTVO, 1996, (12): : 41 - 43
- [30] WELL COMPLETION AND WORKOVER - 6. WELL SERVICING FLUIDS. Petroleum Engineer International, 1980, 52 (01):