共 50 条
- [39] SINGLE FACILITY SCHEDULING PROBLEM INVOLVING MULTIPLE CRITERIA. Production and Inventory Management Journal, 1979, 20 (03): : 33 - 41
- [40] Single facility, group scheduling with respect to maximum tardiness problem Kung Yeh Kung Chieng Hsueh K'an/Journal of the Chinese Institute of Industrial Engineers, 1998, 15 (04): : 411 - 418