共 50 条
- [31] CALCULATING VENTILATION AIR REQUIREMENTS. Plant Engineering (Barrington, Illinois), 1975, 29 (22): : 63 - 64
- [32] MATCHING PUMPS TO SYSTEM REQUIREMENTS. Plant Engineering (Barrington, Illinois), 1975, 29 (21): : 162 - 165
- [34] IMPACT RIPPLING - NCB EXPERIENCE AND REQUIREMENTS. Massachusetts Institute of Technology, School of Engineering, Department of Civil Engineering, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, Report, 1974,
- [36] STEERING GEAR: NEW CONCEPTS AND REQUIREMENTS. Transactions - Institute of Marine Engineers, (Series) TM, 1982, 94
- [37] TRACK REHABILITATION AND MAINTENANCE RESEARCH REQUIREMENTS. United States Federal Railroad Administration, Report, 1980,