DEVELOPMENT OF QUALITY ASSURANCE PROCEDURES ON BRITISH RAIL.

被引:0
|
作者
Wise, S.
机构
关键词
RAILROAD ROLLING STOCK - Manufacture;
D O I
10.1243/PIME_PROC_1980_194_045_02
中图分类号
学科分类号
摘要
This paper intends to show that a railway's interest in the quality of its supplies is not necessarily assured by the traditional railway inspection at the supplier's factory. The present day development of quality control systems applied by the supplier leaves the responsibility for quality where it should be, with the supplier.
引用
收藏
页码:383 / 389
相关论文
共 50 条
  • [41] Quality Assurance Procedures for Mesoscale Meteorological Data
    Fiebrich, Christopher A.
    Morgan, Cynthia R.
    McCombs, Alexandria G.
    Hall, Peter K., Jr.
    McPherson, Renee A.
    JOURNAL OF ATMOSPHERIC AND OCEANIC TECHNOLOGY, 2010, 27 (10) : 1565 - 1582
  • [42] Performance of quality assurance procedures on daily precipitation
    You, Jinsheng
    Hubbard, Kenneth G.
    Nadarajah, Saralees
    Kunkel, Kenneth E.
    JOURNAL OF ATMOSPHERIC AND OCEANIC TECHNOLOGY, 2007, 24 (05) : 821 - 834
  • [43] Semantic Quality Assurance of Industrial Maintenance Procedures
    Woods, Caitlin
    Hodkiewicz, Melinda
    French, Tim
    IEEE ACCESS, 2024, 12 : 122029 - 122046
  • [44] QUALITY ASSURANCE PROCEDURES IN PRIVATE AND PUBLIC PRACTICE
    Fong, Ben Y. F.
    MEDICINE AND LAW, 2019, 38 (01): : 127 - 141
  • [45] FEDERAL-GOVERNMENT QUALITY ASSURANCE PROCEDURES
    LEWIS, JR
    MECHANICAL ENGINEERING, 1975, 97 (08) : 80 - 80
  • [46] DOCUMENTATION AS AN INSTRUMENT OF QUALITY ASSURANCE IN ANESTHETIC PROCEDURES
    KERSTING, T
    ANASTHESIOLOGIE & INTENSIVMEDIZIN, 1993, 34 (03): : 105 - 109
  • [47] Establishing quality-assurance for invasive procedures
    Millat, B
    GASTROENTEROLOGIE CLINIQUE ET BIOLOGIQUE, 2001, 25 (02): : 129 - 130
  • [48] CHARACTERIZATION AND QUALITY ASSURANCE PROCEDURES FOR CERAMIC COATINGS
    ANTOLOTTI, N
    BALDINI, C
    FIORI, F
    RUSTICHELLI, F
    YANG, B
    APPLIED RADIATION AND ISOTOPES, 1995, 46 (6-7) : 727 - 728
  • [49] Daily quality assurance tool and procedures for tomotherapy
    Jursinic, P. A.
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 2006, 66 (03): : S702 - S703
  • [50] LONG WELDED RAIL IN JAPAN (2) - MAINTENANCE AND MANAGEMENT OF LONG WELDED RAIL.
    Ieda, Hitoshi
    Permanent Way, 1985, 26 (04): : 30 - 42