共 50 条
- [42] Minimizing Total Weighted Tardiness for Scheduling Equal-Length Jobs on a Single Machine Automation and Remote Control, 2020, 81 : 853 - 868
- [43] Minimizing Total Weighted Completion Times for Semi-online Single Machine Scheduling IFAC PAPERSONLINE, 2022, 55 (10): : 2191 - 2196
- [44] Minimizing Total Tardiness in a Two-Machine Flowshop Scheduling Problem with Availability Constraints INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2023, 35 (01): : 1119 - 1134
- [46] Minimizing total weighted tardiness on parallel batch-processing machine scheduling problems with varying machine capacities MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 3906 - +
- [48] Minimizing total weighted tardiness on parallel batch-processing machine scheduling problems with varying machine capacities Appl. Mech. Mater., (3906-3913):
- [49] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
- [50] An Investigation of Phase Transitions in Single-Machine Scheduling Problems TWENTY-SEVENTH INTERNATIONAL CONFERENCE ON AUTOMATED PLANNING AND SCHEDULING, 2017, : 325 - 329