共 50 条
- [41] Signal Acquisition and Process on Tower Crane Safety Control System MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 2141 - 2144
- [45] Crane overlap and operational flexibility: balancing utilization, duration, and safety CONSTRUCTION INNOVATION-ENGLAND, 2018, 18 (01): : 43 - 63
- [48] Investigation of crane operation safety by analysing main accident causes RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, 2017, : 74 - 80
- [49] Enhancing Tower Crane Safety Using Condition Monitoring System APPLIED MECHATRONICS AND ANDROID ROBOTICS, 2013, 418 : 80 - +
- [50] On safety increase of tower crane KB-572 exploitation Montazhnye i Spetsial'nye Raboty v Stroitel'stve, 2001, (01): : 15 - 17