共 50 条
- [41] LATERAL STABILITY OF LONG PRESTRESSED CONCRETE BEAMS JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1971, 16 (06): : 85 - &
- [42] FUTURE OF PRESTRESSED CONCRETE - LONG LOOK AHEAD JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1976, 21 (05): : 204 - 214
- [43] A case study of a vibratory pile installation monitoring of a precast prestressed concrete pile DFI 2004: DEEP FOUNDATIONS INSTITUTE, CONFERENCE PROCEEDINGS, 2004, : 273 - 281
- [44] Long Distance Large Diameter Heating Pipeline Leakage Detection Based on Acoustic Pressure Sensor 2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 2289 - 2294
- [45] Experimental Study and Numerical Simulation of Three-Edge Bearing Test of Large Diameter Prestressed Concrete Cylinder Pipes PIPELINES 2018: CONDITION ASSESSMENT, CONSTRUCTION, AND REHABILITATION, 2018, : 776 - 787
- [47] Investigation on flexural behavior of pretensioned prestressed steel strand high strength concrete large-diameter pipe piles Jianzhu Jiegou Xuebao/Journal of Building Structures, 2022, 43 (08): : 282 - 292