PERFORMANCE OF FULL FACERS ON KIELDER TUNNELS.

被引:0
|
作者
Berry, N.S.M.
Brown, J.G.W.
机构
来源
Tunnels and Tunnelling | 1977年 / 9卷 / 04期
关键词
WATER SUPPLY TUNNELS;
D O I
暂无
中图分类号
TU [建筑科学]; U [交通运输];
学科分类号
08 ; 0813 ; 0823 ;
摘要
Up to the end of February 1977 a total of 6. 8 km of the 28 km long Derwent-Wear-Tees Tunnels which form part of the transfer works of the Northumbrian Water Authority's Kielder Water Scheme, had been driven. Three headings are being driven using full face tunneling machines, two of which are Demag machines of 3. 5 m diam and the other a Robbins of 3. 55 diam. The remaining heading at Derwent is at present being driven by drill and blast for the first 650 m, after which it is intended to introduce one of the Demag machines. The article discusses the machines, the geology of the area, driving progress, penetration rates, and other aspects of the project.
引用
收藏
页码:35 / 40
相关论文
共 50 条
  • [21] VENTILATION SYSTEM FOR MOTORWAY TUNNELS.
    Lowndes, J.F.L.
    Fudger, G.
    Heating and Ventilating Engineer: The Journal of Environmental Services, 1979, 53 (620): : 10 - 14
  • [22] MAINTENANCE OF THE KANMON RAILWAY TUNNELS.
    Miyaguchi, Korehide
    1986, 1 (3-4): : 307 - 314
  • [23] ELASTIC JOINTS FOR PRESSURE TUNNELS.
    Schaer, Heinz O.
    Tunnels and Tunnelling International, 1984, 16 (10): : 25 - 26
  • [24] COMPRESSIBLE AND LEAKY TRAINS IN TUNNELS.
    Vardy, A.E.
    Fox, J.A.
    Proceedings of the Institution of Mechanical Engineers. Part D, Transport engineering, 1987, 201 (03): : 209 - 215
  • [25] Design of Modern Subway Tunnels.
    Schikora, K.
    Fink, T.
    Bauingenieur Berlin, 1982, 57 (05): : 193 - 198
  • [26] DESIGN OF PERVIOUS PRESSURE TUNNELS.
    Schleiss, A.J.
    International Water Power and Dam Construction, 1986, 38 (05): : 21 - 26
  • [27] Automation of Geometrical Studies in Tunnels.
    Sartori, Claude
    Revue Generale des Chemins de Fer, 1981, 100 : 763 - 774
  • [28] VENTILATION: FIGHTING FIRES IN ROAD TUNNELS.
    Haerter, Alex
    Tunnels and Tunnelling International, 1988, 20 (04): : 55 - 58
  • [29] Recommendations on Diagnosis Methods for Lined Tunnels.
    Anon
    Tunnels et ouvrages souterrains Villeurbanne, 1981, (44): : 62 - 77
  • [30] Required Ventilation of Longer Road Tunnels.
    Herzog, M.
    Bauingenieur Berlin, 1986, 61 (03): : 129 - 136