共 50 条
- [42] REMODELING HYDROTURBINE EQUIPMENT - THE MOST IMPORTANT WAYS OF INCREASING THE RELIABILITY AND EFFICIENCY OF HYDROELECTRIC POWER STATIONS. Soviet energy technology, 1987, (11): : 8 - 13
- [43] A COMPARISON OF ECONOMICS OF FOSSIL AND NUCLEAR POWER STATIONS FOR GENERATING POWER AND PROCESS STEAM ATOMWIRTSCHAFT, 1969, 14 (08): : 393 - &
- [44] EFFICIENCY OF STEAM-TURBINE GENERATORS FOR CENTRAL POWER-STATIONS ELECTRONICS AND POWER, 1984, 30 (01): : 23 - 27
- [46] MEASURES DESIGNED TO IMPROVE AVAILABILITY AND ECONOMY OF LARGE STEAM POWER STATIONS COMBUSTION, 1970, 42 (02): : 26 - &
- [47] MODELLING THE PROCESS SYSTEM OF COMBUSTION OF KAVAKSK BROWN COAL, SUPPLIED HYDRAULICALLY TO THERMAL POWER STATIONS. Thermal Engineering (English translation of Teploenergetika), 1987, 34 (05): : 275 - 278
- [48] ASPECTS OF CONSTRUCTION AND OPERATION OF NUCLEAR POWER STATIONS FOR GENERATION OF PROCESS STEAM ATOMWIRTSCHAFT, 1969, 14 (08): : 390 - &
- [49] Improving the reliability of the steam heat-transfer equipment at cogeneration power stations Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 1998, 11 (04): : 64 - 67
- [50] Commercial efficiency for nuclear power plants and steam stations under market conditions Izvestiya Akademii Nauk. Energetika, 2003, (06): : 69 - 86