共 50 条
- [33] IDENTIFICATION OF FUNCTIONS WITH ORTHOGONAL PROPERTIES BY THE GROUP METHOD OF DATA HANDLING AVTOMATIKA, 1979, (02): : 46 - 54
- [35] Noise immunity of criteria in group method of data handling (GMDH) Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 1995, 15 (12): : 60 - 68
- [36] Software Reliability Prediction Using Group Method of Data Handling ROUGH SETS, FUZZY SETS, DATA MINING AND GRANULAR COMPUTING, PROCEEDINGS, 2009, 5908 : 344 - +
- [37] GROUP METHOD OF DATA HANDLING IN PROBLEMS OF FAN CAPACITY CONTROL AVTOMATIKA, 1989, (04): : 75 - 78
- [38] OBSERVATION, CONJECTURE AND EXPERIMENT WITH GROUP METHOD OF DATA HANDLING ALGORITHMS SYSTEMS ANALYSIS MODELLING SIMULATION, 1989, 6 (11-12): : 867 - 906
- [39] Group Method of Data Handling as a Tool to Determine Vertical Displacements 3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
- [40] USING GROUP METHOD OF DATA HANDLING FOR BRAIN COMPUTER INTERFACE UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 900 - 906