共 50 条
- [22] Remote pipeline diagnostics boosts station performance and cuts costs Gas Turbine World, 2002, 32 (06): : 32 - 34
- [23] PLC-based SCADA network cuts downtime on 2300-mile pipeline Chilton's I&CS (Instrumentation & Control Systems), 1994, 67 (01):
- [25] SWITCH FROM TRUCKS TO BELT CONVEYOR CUTS OPERATING COSTS ROCK PRODUCTS, 1983, 86 (07): : 40 - 42
- [29] GE CUTS T700 FABRICATION COSTS WITH EXPANDED USE OF CASTINGS AVIATION WEEK & SPACE TECHNOLOGY, 1985, 122 (12): : 53 - &
- [30] COMPUTER-ASSISTED DESIGN CUTS COSTS FOR PIPELINE PROJECT. Oil and Gas Journal, 1984, 82 (26): : 84 - 86