Construction manager steers school's HVAC retrofit

被引:0
|
作者
Hill, Warren [1 ]
Teyema, Brian R. [1 ]
机构
[1] Hill Mechanical Corp, Chicago, United States
来源
关键词
Construction - Cooling - Costs - Electric lighting - Retrofitting - Scheduling - School buildings - Space heating - Supervisory personnel - Ventilation;
D O I
暂无
中图分类号
学科分类号
摘要
A two-year renovation project in New Trier High School, Ill., is underway to install a modern HVAC system and new lighting that will improve the indoor environment, hence enhancing the overall learning environment. The school selected a large Chicago-based HVAC contractor, Hill Mechanical Group, to be the construction manager (CM). The design, construction drawings, scheduling, bidding process, and CM's onsite project mobilization are discussed. The mechanical CM process is a success.
引用
收藏
相关论文
共 50 条
  • [1] HVAC retrofit for campus
    King, JE
    ASHRAE JOURNAL, 2001, 43 (06) : 67 - 68
  • [2] Holistic HVAC Retrofit
    Talend, Don
    MECHANICAL ENGINEERING, 2009, 131 (08) : 22 - 22
  • [3] Continuous training in school and the manager's role in the construction of critical collaboration spaces
    de Sousa, Sandra Santella
    Liberali, Fernanda Coelho
    David Pereira da Silva, Cristina Rosa
    REVISTA TEMPOS E ESPACOS EDUCACAO, 2021, 14 (33):
  • [4] HVAC and controls retrofit of a manufacturing plant
    Gill, KE
    Patterson, JH
    BUILDING FOR THE 21ST CENTURY: ENERGY & THE ENVIRONMENT, 2000, : 187 - 192
  • [5] Re: Air-cooled HVAC retrofit
    Kavanaugh, S
    ASHRAE JOURNAL, 2004, 46 (07) : 12 - 12
  • [6] Construction manager's technical competencies in Malaysian construction projects
    Abdullah, Abd Halid
    Yaman, Siti Khalijah
    Mohammad, Hairuddin
    Hassan, Padzil Fadzil
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (02) : 153 - 177
  • [7] Exploring a Multizone To Variable Volume HVAC Controls Retrofit
    Westervelt, Eileen T.
    Bush, Joseph
    Schwenk, David M.
    ASHRAE Journal, 2022, 64 (09) : 32 - 47
  • [8] Exploring a Multizone To Variable Volume HVAC Controls Retrofit
    Westervelt, Eileen T.
    Bush, Joseph
    Schwenk, David M.
    ASHRAE JOURNAL, 2022, 64
  • [9] HVAC and controls retrofit of a manufacturing plant: Part I
    Aguirre Corp, Dallas, United States
    HPAC Heat Piping Air Cond, 11
  • [10] Construction Manager's Competency in Managing the Construction Process of IBS Projects
    Jabar, Izatul Laili
    Ismail, Faridah
    Aziz, Nur Mardhiyah
    Janipha, Nurul Afida Isnaini
    ASIA PACIFIC INTERNATIONAL CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES (AICE-BS 2013) LONDON, 2013, 105 : 85 - 93