- [41] Long campaign life of CST No. 1 blast furnace REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (06): : S13 - S20
- [42] Reduced revamp duration at Chiba No. 6 blast furnace Iron and Steel Engineer, 1999, 76 (06): : 38 - 42
- [44] Actions and control of CST blast furnace No. 2 hearth REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (03): : 183 - 188
- [46] Interim repair of the Lake Erie works' No. blast furnace Iron and Steel Engineer, 1990, 67 (06):
- [47] COMMISSIONING OF NO. 5 BLAST FURNACE AT PORT KEMBLA. Kansas State University, Institute for Systems Designs and Optimization, Report, 1976,
- [48] Maintaining casting performance and the continuous improvement process at Ispat Inland's No. 7 blast furnace Iron and Steelmaker (I and SM), 2003, 30 (08): : 107 - 111