共 50 条
- [21] CRITERIA FOR EVALUATING ECONOMIC EFFECTIVENESS OF NEW TECHNOLOGY PROBLEMS OF ECONOMICS, 1975, 18 (08): : 70 - 85
- [23] Input-Output Analysis on Socio-Economic Benefits of Highway Projects Case Study on Jinji Highway PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1718 - +
- [24] Tools for safety-throughput analysis of automated highway systems PROCEEDINGS OF THE 1997 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 1997, : 2031 - 2035
- [25] Simulation study of learning automata games in automated highway systems IEEE CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS, 1997, : 936 - 941
- [26] The analysis on quality-cost of construction process in highway engineering projects PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 569 - 572
- [28] COST-ANALYSIS FOR ECONOMIC JUSTIFICATION FOR AUTOMATED TECHNOLOGIES 1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS, 1989, : 584 - 587
- [29] Study on the Engineering Cost Management Systems ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2621 - +
- [30] Using a geographic information system for automated decision making in highway cost analysis TRANSPORTATION DATA AND INFORMATION TECHNOLOGY: PLANNING AND ADMINISTRATION, 2001, (1768): : 260 - 267