Trailing suction hopper dredgers

被引:0
|
作者
机构
来源
DPC Dredg Port Constr | / 8卷 / 13期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Digital twin-driven virtual sensor approach for safe construction operations of trailing suction hopper dredger
    Li, Mingchao
    Lu, Qiaorong
    Bai, Shuo
    Zhang, Mengxi
    Tian, Huijing
    Qin, Liang
    AUTOMATION IN CONSTRUCTION, 2021, 132
  • [42] DIESEL-ELECTRIC SUCTION DREDGERS FOR SUEZ CANAL
    不详
    NAVAL ARCHITECT, 1977, (01): : 18 - 18
  • [43] Strengthening Jiyigong dyke at Jiujiang with cutter - suction dredgers
    Chang, H.-J.
    Xu, J.-X.
    Ni, J.-C.
    Renmin Changjiang/Yangtze River, 2001, 32 (12): : 3 - 5
  • [45] Modeling of Trailing Suction Hopper Dredger: A Two-Step Method Integrating Deep Neural Network and Human Knowledge
    Tang, Hui
    Chai, Li
    Shi, Qizheng
    Zhang, Ji
    IEEE SENSORS JOURNAL, 2022, 22 (02) : 1552 - 1559
  • [46] Automatic Mooring and Discharge System of the Kaisho-Maru, a Trailing Suction Hopper Dredger Combined Oil Recovery Vessel
    Kume, Hideki
    COASTAL STRUCTURES 2011, VOL 1 & 2, 2013, : 1522 - 1524
  • [47] New generation of suction dredgers in sand and gravel extraction
    Lensing, Heinz-Juergen
    Seiter, Joachim
    Snippe, Wim
    2001, AT Verlag fuer Aufbereitung GmbH, Wiesbaden, Germany (42):
  • [48] Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model
    Bai, Shuo
    Li, Mingchao
    Lu, Qiaorong
    Tian, Huijing
    Qin, Liang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (02)
  • [49] CHAO TA H8 - A STEP BY STEP DESCRIPTION OF THE PROCUREMENT PROJECT FOR A TRAILING SUCTION HOPPER DREDGER FOR USE IN THAILAND
    不详
    NAVAL ARCHITECT, 1986, : E306 - &
  • [50] Slurry erosion-corrosion of scoop teeth of suction dredgers
    Huadong Chuanbo Gongye Xueyuan Xuebao/Journal of East China Shipbuilding Institute, 1996, 10 (01):