共 50 条
- [43] Multicriterion problem of NPP lifetime management PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 579 - 584
- [44] Application of risk assessment and decision analysis to the evaluation and ranking of environmental remediation alternatives: Identification and evaluation of alternatives PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 149 - 154
- [50] MULTICRITERION ANALYSIS OF HYDROPOWER OPERATION JOURNAL OF ENERGY ENGINEERING-ASCE, 1989, 115 (03): : 132 - 153