Semiconductor wafer fabrication

被引:0
|
作者
机构
来源
Chem Eng Educ | / 4卷 / 266期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [21] Shift scheduling for steppers in the semiconductor wafer fabrication process
    Kim, Sooyoung
    Yea, Seung-Hee
    Kim, Bokang
    IIE Transactions (Institute of Industrial Engineers), 2002, 34 (02): : 167 - 177
  • [22] Adaptive Dispatching Rule for Semiconductor Wafer Fabrication Facility
    Li, Li
    Sun, Zijin
    Zhou, MengChu
    Qiao, Fei
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (02) : 354 - 364
  • [23] Alternative facility layouts for semiconductor wafer fabrication facilities
    Purdue Univ, West Lafayette, United States
    IEEE Trans Compon Packag Manuf Technol Part C, 2 (152-163):
  • [24] Shift scheduling for steppers in the semiconductor wafer fabrication process
    Kim, S
    Yea, SH
    Kim, B
    IIE TRANSACTIONS, 2002, 34 (02) : 167 - 177
  • [25] Evaluating the impacts of reticle requirements in semiconductor wafer fabrication
    de Díaz, SLM
    Fowler, JW
    Pfund, ME
    Mackulak, GI
    Hickie, M
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2005, 18 (04) : 622 - 632
  • [26] PRACTICAL ISSUES IN SCHEDULING AND DISPATCHING IN SEMICONDUCTOR WAFER FABRICATION
    JOHRI, PK
    JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (06) : 474 - 485
  • [27] Dynamic scheduling rule selection for semiconductor wafer fabrication
    Hsieh, BW
    Chang, SC
    Chen, CH
    2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 535 - 540
  • [28] Scheduling semiconductor wafer fabrication with optimization of multiple objectives
    Wang, Zuntong
    Qiao, Fei
    Wu, Qidi
    2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 253 - +
  • [29] A method for wafer assignment in semiconductor wafer fabrication considering both quality and productivity perspectives
    Lee, Dong-Hee
    Lee, Chang-Ho
    Choi, Seung-Hyun
    Kim, Kwang-Jae
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 52 : 23 - 31
  • [30] Life cycle inventory development for wafer fabrication in semiconductor manufacturing
    Murphy, CF
    Laurent, JP
    Allen, DT
    2003 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2003, : 276 - 281