共 50 条
- [21] Shift scheduling for steppers in the semiconductor wafer fabrication process IIE Transactions (Institute of Industrial Engineers), 2002, 34 (02): : 167 - 177
- [23] Alternative facility layouts for semiconductor wafer fabrication facilities IEEE Trans Compon Packag Manuf Technol Part C, 2 (152-163):
- [27] Dynamic scheduling rule selection for semiconductor wafer fabrication 2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 535 - 540
- [28] Scheduling semiconductor wafer fabrication with optimization of multiple objectives 2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 253 - +
- [30] Life cycle inventory development for wafer fabrication in semiconductor manufacturing 2003 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2003, : 276 - 281