Just-in-time implementation in South Africa

被引:0
|
作者
Karle, M.P.
机构
来源
FWP journal | 1988年 / 28卷 / 08期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
4
引用
收藏
相关论文
共 50 条
  • [41] Just-in-time DG
    不详
    [J]. POWER, 2004, 148 (08) : 10 - 10
  • [42] Just-in-time cloning
    Hybinette, M
    [J]. 18TH WORKSHOP ON PARALLEL AND DISTRIBUTED SIMULATION, PROCEEDINGS, 2004, : 45 - 51
  • [43] JUST-IN-TIME MINING
    WHITEWAY, P
    [J]. CANADIAN MINING JOURNAL, 1993, 114 (04) : 20 - &
  • [44] Just-in-time certification
    Rushby, John
    [J]. 12TH IEEE INTERNATIONAL CONFERENCE ON ENGINEERING COMPLEX COMPUTER SYSTEMS, PROCEEDINGS, 2007, : 15 - 24
  • [45] JUST-IN-TIME PRODUCTION
    JAMROG, MR
    [J]. HARVARD BUSINESS REVIEW, 1987, 65 (01) : 156 - &
  • [46] COMPUTERS AND JUST-IN-TIME
    MOONEY, T
    [J]. PLATING AND SURFACE FINISHING, 1992, 79 (06): : 60 - 61
  • [47] Just-in-Time to Just-in-Case
    Ramesh N.
    Dickerson T.
    [J]. IEEE Engineering Management Review, 2022, 50 (02): : 17 - 18
  • [48] JUST-IN-TIME FOR A CHANGE
    PENNUCCI, NJ
    [J]. QUALITY PROGRESS, 1987, 20 (11) : 67 - 68
  • [49] Just-in-Time Teaching
    Clark, Kevin R.
    [J]. RADIOLOGIC TECHNOLOGY, 2016, 87 (04) : 465 - 467
  • [50] Conceptual framework for the implementation of zero inventory and just-in-time manufacturing concepts
    Gunasekaran, A.
    Goyal, S.K.
    Martikainen, T.
    Yli-Olli, P.
    [J]. Human Factors and Ergonomics In Manufacturing, 8 (01): : 63 - 78