NEW WORKOVER TOOL IMPROVES WELL PERFORMANCE.

被引:0
|
作者
Anon [1 ]
机构
[1] Petroleum Engineer Int, Dallas, TX,, USA, Petroleum Engineer Int, Dallas, TX, USA
来源
Petroleum Engineer International | 1986年 / 58卷 / 07期
关键词
OIL WELL PUMPING - OIL WELLS - Scale Problems;
D O I
暂无
中图分类号
学科分类号
摘要
This article describes a newly developed tool called hydro-knife designed specifically for cleaning slotted liners. The tool's key features are expandable knife plates mounted between two cups. As the tool passes across the liner, steel knives pop into the liner's slots to clean out debris. The tool is run to the bottom of the well on a string of tubing. A workover fluid is pumped down the tubing to pressure out the knife plates to within 1/8 in. of the liner wall, which gives the plates clearance between slots. The action of the knives in scrapping out debris combined with pressure washing action of the workover fluid being pumped down the tubing dramatically improves the cleaning process. The hydro-knife was installed at a Texaco operated well in the Kern River field in California where it helped raise the well output from 8 b/d net to 20 b/d net.
引用
收藏
相关论文
共 50 条
  • [21] MODULAR MANIFOLD CONCEPT REDUCES PIPING AND IMPROVES PERFORMANCE.
    Forney, R.D.
    1600, (37):
  • [22] Well workover equipment and technology improvements
    Farkhutdinov, RG
    Orlov, GA
    Gabdullin, RG
    Kadyrov, RR
    Musabirov, MK
    NEFTYANOE KHOZYAISTVO, 1996, (12): : 41 - 43
  • [23] Assistance From Automated ASPECTS Software Improves Reader Performance.
    Delio, Philip R.
    Wong, Matthew L.
    Tsai, Jenny P.
    Hinson, H. E.
    McMenamy, John
    Le, Thang
    Prabhu, Divya
    Mann, Barry
    Copeland, Karen
    Kwok, Keith
    Haerian, Hafez
    Lansberg, Maarten G.
    Heit, Jeremy
    STROKE, 2021, 52
  • [24] Ways of financing of well-workover operation
    Kolomeets, VV
    Tokunov, SV
    NEFTYANOE KHOZYAISTVO, 2005, (01): : 20 - 21
  • [25] Tool set improves performance
    Fulton, C
    COMMUNICATIONS NEWS, 2006, 43 (03): : 25 - 25
  • [26] Saline priming of Pall LRF XLS filter improves performance.
    Drew, MJ
    Lindemann, JW
    Tindall, C
    TRANSFUSION, 1997, 37 (09) : S62 - S62
  • [27] Well-workover operation process optimization
    Galiev, T. I.
    Zaytsev, D. P.
    GEORESURSY, 2012, 45 (03) : 81 - 83
  • [28] WORKOVER WELL CONTROL .2. KILLING A PRODUCING WELL
    ADAMS, N
    OIL & GAS JOURNAL, 1981, 79 (33) : 115 - 119
  • [30] WELL COMPLETION AND WORKOVER - 6. WELL SERVICING FLUIDS.
    Patton, L.Douglas
    Abbott, William A.
    Petroleum Engineer International, 1980, 52 (01):