ESTIMATING WORK CONTENT AND MEASURING PRODUCTIVITY.

被引:0
|
作者
Wolfram, J.
机构
来源
| 1600年 / 11期
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
JOINTS - Costs - STATISTICAL METHODS - Applications
引用
收藏
相关论文
共 50 条
  • [21] BUSINESS CYCLE AND PRODUCTIVITY.
    Anon
    1600, (33):
  • [22] WORKSTATION GRAPHICS AND PRODUCTIVITY.
    Henderson, Paul
    Machine and tool blue book, 1986, 81 (6 pt 1): : 46 - 50
  • [23] TECHNOLOGY - A KEY TO PRODUCTIVITY.
    Banerjee, Bani R.
    Journal of Metals, 1983, 35 (07): : 42 - 45
  • [24] DIRECT ROUTE TO PRODUCTIVITY.
    Thurley, John
    Gas engineering and management, 1981, 21 (04): : 141 - 160
  • [25] CAD/CAM PRODUCTIVITY.
    Perri, Robert E.
    Design News (Boston), 1985, 41 (13): : 107 - 109
  • [26] Electrical Environment and Productivity.
    Lang, Siegnot
    Lehmair, Michael
    Klima & Kaelte Ingenieur, 1977, 5 (02): : 61 - 66
  • [27] Word formation change and productivity.
    Luedeling, Anke
    BEITRAGE ZUR GESCHICHTE DER DEUTSCHEN SPRACHE UND LITERATUR, 2009, 131 (02): : 333 - 339
  • [28] AGVS BLAZE PATH TO PRODUCTIVITY.
    Dvorak, Karen S.
    Assembly engineering, 1987, 30 (09): : 32 - 34
  • [29] EDUCATION - THE NEGLECTED FACTOR IN PRODUCTIVITY.
    Joklik, G.Frank
    Journal of Metals, 1982, 34 (05): : 37 - 39
  • [30] FACTOR MODEL OF CONSTRUCTION PRODUCTIVITY.
    Thomas, H.Randolph
    Yiakoumis, Iacovos
    Journal of Construction Engineering and Management, 1987, 113 (04) : 632 - 639