共 50 条
- [43] HOW TO CUT COSTS IN DEBURRING OPERATIONS PLATING AND SURFACE FINISHING, 1979, 66 (01): : 38 - 40
- [44] HOW TO CUT PIPEWORK INSTALLATION COSTS REFRIGERATION AND AIR CONDITIONING, 1970, 73 (867): : 77 - &
- [46] HOW TO DESIGN ENERGY-SAVING INDUSTRIAL COMPRESSED AIR SYSTEMS. Hydraulics and Pneumatics, 1986, 39 (01): : 135 - 138
- [47] HOW TO DESIGN ENERGY-SAVING INDUSTRIAL COMPRESSED AIR SYSTEMS. Hydraulics and Pneumatics, 1986, 39 (06): : 36 - 38
- [48] HOW TO DESIGN ENERGY-SAVING INDUSTRIAL COMPRESSED AIR SYSTEMS. Hydraulics and Pneumatics, 1987, 40 (02): : 59 - 60
- [49] HOW TO DESIGN ENERGY-SAVING INDUSTRIAL COMPRESSED AIR SYSTEMS. Hydraulics and Pneumatics, 1986, 39 (05): : 64 - 65