Integrating MRP and finite capacity planning

被引:0
|
作者
Taal, Martin [1 ]
Wortmann, Johan C. [1 ]
机构
[1] Eindhoven Univ of Technology, Eindhoven, Netherlands
来源
Production Planning and Control | 1997年 / 8卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:245 / 254
相关论文
共 50 条
  • [41] Optimal internal pricing and capacity planning for service facility with finite buffer
    Sumita, U
    Masuda, Y
    Yamakawa, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (01) : 192 - 205
  • [42] Finite capacity planning algorithm for semiconductor industry considering lots priority
    Mhiri, E.
    Jacomino, M.
    Mangione, F.
    Vialletelle, P.
    Lepelletier, G.
    IFAC PAPERSONLINE, 2015, 48 (03): : 1598 - 1603
  • [43] Development of finite capacity material requirement planning system for assembly operations
    Wuttipornpun, T
    Yenradee, P
    PRODUCTION PLANNING & CONTROL, 2004, 15 (05) : 534 - 549
  • [44] CALL FOR ACTION: INTEGRATING CIM AND MRP II.
    Richardson, Douglas W.
    1988, 29 (02): : 32 - 35
  • [45] PLANNING CAPACITY AND THE CAPACITY OF PLANNING - A CRITICAL OBJECTION
    BECKERS, T
    LANDSCAPE PLANNING, 1980, 7 (04): : 387 - 390
  • [46] Capacity Planning Under Uncertainty: Developing Local Area Strategies for Integrating Distributed Resources
    Feinstein, Charles D.
    Morris, Peter A.
    Chapel, Stephen W.
    ENERGY JOURNAL, 1997, : 85 - 110
  • [47] MEDIUM TO SHORT-TERM FINITE-CAPACITY SCHEDULING - A PLANNING METHODOLOGY FOR CAPACITY CONSTRAINED WORKSHOPS
    MCCARTHY, SW
    BARBER, KD
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 19 (1-3): : 189 - 199
  • [48] MRP AND AGGREGATE PLANNING - A PROBLEMS SOLUTION.
    Migliorelli, Marcia
    Swan, Robert J.
    1988, 29 (02): : 42 - 45
  • [50] PLANNING AND CONTROLLING PRODUCTION WITH MRP-II
    SAWYER, P
    CHEMICAL ENGINEER-LONDON, 1990, (470): : 32 - 34