共 50 条
- [21] GOVERNING TURBINES FOR TRANSIENT LOADS. International Water Power and Dam Construction, 1981, 33 (04): : 38 - 42
- [25] BELT CONVEYORS FOR SEMIBULK LOADS. Plant Engineering (Barrington, Illinois), 1975, 29 (17): : 85 - 88
- [28] DEVELOPMENT OF TIME-HISTORY DESIGN CRITERIA FOR UNCERTAIN TRANSIENT LOADS. Transactions of the International Conference on Structural Mechanics in Reactor Technology, 1979, M.
- [30] Systems design criteria for uniformly distributed loads. The refrigerated containers park 2018 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING (IAS), 2018,