共 50 条
- [42] An Alternative Method of Estimating Piping Construction Projects PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 1131 - 1136
- [43] COSTING PIPING, THE BUGABOO OF CHEMICAL PLANT ESTIMATING INDUSTRIAL AND ENGINEERING CHEMISTRY, 1959, 51 (01): : A81 - A83
- [44] Hot water distribution system piping heat loss factors - Phase I: Test results ASHRAE Transactions 2006, Vol 112, Pt 1, 2006, 112 : 436 - 446
- [48] Fittings, pipes... Well tempered: Heat- and cold-loss insulated pipelines Chemie-Technik (Heidelberg), 2000, 29 (04): : 172 - 175