Extension of the model for the problem of workpiece scheduling in a flexible manufacturing cell

被引:0
|
作者
Fundacao Centro Tecnologico para, Informatica, Campinas, Brazil [1 ]
机构
来源
Prod Plann Control | / 2卷 / 176-180期
关键词
Number:; -; Acronym:; CNPq; Sponsor: Conselho Nacional de Desenvolvimento Científico e Tecnológico;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Agnetis, A
    Dror, M
    Vakharia, AJ
    Rossi, F
    IIE TRANSACTIONS, 1996, 28 (05) : 425 - 437
  • [42] Petri net based control for the dynamic scheduling of a flexible manufacturing cell
    Malo-Tamayo, AJ
    Gavino-Contreras, D
    Ramirez-Trevino, A
    1998 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5, 1998, : 553 - 557
  • [43] Multi-AGV Flexible Manufacturing Cell Scheduling Considering Charging
    Li, Jianxun
    Cheng, Wenjie
    Lai, Kin Keung
    Ram, Bhagwat
    MATHEMATICS, 2022, 10 (19)
  • [44] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Universita di Roma 'La Sapienza', Roma, Italy
    IIE Trans, 5 (425-437):
  • [45] Performance-based dynamic scheduling model for flexible manufacturing systems
    Buyurgan, N
    Mendoza, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (07) : 1273 - 1295
  • [46] Optimal Task Scheduling in a Flexible Manufacturing System using Model Checking
    Malik, Robi
    Pena, Patricia N.
    IFAC PAPERSONLINE, 2018, 51 (07): : 230 - 235
  • [47] Integrated scheduling technology of flexible manufacturing workshop based on Holon model
    Chen, Yanyun
    Zheng, Pengfei
    Academic Journal of Manufacturing Engineering, 2019, 17 (04): : 52 - 58
  • [48] An optimization model for flexible routing based flowshop scheduling problem
    Wang, Qing
    Wang, Fan
    Liu, Shu-an
    Qi, Yanhui
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 1984 - 1989
  • [49] An optimization model for cyclic scheduling problem in flexible robotic cells
    Nejad, Mazyar Ghadiri
    Kovacs, Gergely
    Vizvari, Bela
    Barenji, Reza Vatankhah
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (9-12): : 3863 - 3873
  • [50] An optimization model for cyclic scheduling problem in flexible robotic cells
    Mazyar Ghadiri Nejad
    Gergely Kovács
    Béla Vizvári
    Reza Vatankhah Barenji
    The International Journal of Advanced Manufacturing Technology, 2018, 95 : 3863 - 3873