Maintenance gets cracking

被引:0
|
作者
McCormick, Carroll
机构
来源
Canadian Mining Journal | 2005年 / 126卷 / 07期
关键词
Maintenance - Planning - Project management;
D O I
暂无
中图分类号
学科分类号
摘要
The maintenance plan for the Scotford Upgrader, part of Alberta's legendary Athabasca Oil Sands project that resulted in unexpected breakdown provided an opportunity to do as much turnaround work as possible. Shell Canada, one of three partners involved in the Athabasca Oil Sands project immediately launched a maintenance turnaround that was originally scheduled for the spring of the year 2005. The result of being able to turn this breakdown into an opportunity was that the net loss of production due to the pump failure, although off schedule timing-wise, was zero. The turnaround was completed in 39 days, six less than on the planning schedule.
引用
收藏
页码:27 / 29
相关论文
共 50 条
  • [31] DEVICE FOR AUTOMATIC MAINTENANCE OF MAGNESIUM CHLORIDE CONCENTRATION IN TESTS FOR STRESS CORROSION CRACKING.
    Shapovalov, E.T.
    Kazakova, G.V.
    [J]. Protection of Metals (English translation of Zaschita Metallov), 1983, 19 (03): : 417 - 418
  • [32] Inspection and depth sizing of surface-initiated cracking for preventive maintenance of asphalt pavements
    Franesqui, Miguel A.
    Gallego, Juan
    [J]. INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2023, 24 (02)
  • [33] A risk-oriented degradation model for maintenance of reinforced concrete structure subjected to cracking
    El Hajj, Boutros
    Castanier, Bruno
    Schoefs, Franck
    Yeung, Thomas
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2016, 230 (05) : 521 - 530
  • [34] Age-based preventive maintenance for passive components submitted to stress corrosion cracking
    Castro, I. T.
    Barros, Anne
    Grall, Antoine
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2011, 54 (1-2) : 598 - 609
  • [35] ATHEROSCLEROSIS - WHO GETS IT AND HOW IT GETS THERE
    DUCAS, J
    [J]. CANADIAN JOURNAL OF CARDIOLOGY, 1993, 9 (02) : 160 - 161
  • [36] What gets measured gets done
    [J]. Water 21, 2006, APR. (45):
  • [37] What Gets Measured Gets Managed
    Lalji, Rahim
    Laguna, Javier Munoz
    Kauth, Jael
    Hofstetter, Leonie
    Kurmann, Astrid
    Adams, Jon
    Kongsted, Alice
    von Wyl, Viktor
    Puhan, Milo A.
    Hincapie, Cesar A.
    [J]. AMERICAN JOURNAL OF PHYSICAL MEDICINE & REHABILITATION, 2024, 103 (09) : e113 - e121
  • [38] DEVICE FOR AUTOMATIC MAINTENANCE OF MAGNESIUM-CHLORIDE CONCENTRATION IN TESTS FOR STRESS-CORROSION CRACKING
    SHAPOVALOV, ET
    KAZAKOVA, GV
    [J]. PROTECTION OF METALS, 1983, 19 (03): : 417 - 418
  • [39] LASER PEENING SYSTEMS FOR PREVENTIVE MAINTENANCE AGAINST STRESS CORROSION CRACKING IN NUCLEAR POWER REACTORS
    Uehara, Takuya
    Yoda, Masaki
    Sano, Yuji
    Mukai, Naruhiko
    Chida, Itaru
    Kato, Hiromi
    [J]. ICONE16: PROCEEDING OF THE 16TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2008, VOL 1, 2008, : 491 - 497
  • [40] What Gets Measured Gets (Micro)managed
    Ranji, Sumant R.
    [J]. JAMA-JOURNAL OF THE AMERICAN MEDICAL ASSOCIATION, 2020, 323 (17): : 1688 - 1689