A heuristic scheduling algorithm for improving the duration and net present value of a project

被引:0
|
作者
Ulusoy, G.
Oezdamar, L.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jose, G. Jegan
    Raja, K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366
  • [42] Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems
    Mahmud, Firoz
    Zaman, Forhad
    Sarker, Ruhul
    Essam, Daryl
    2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
  • [43] Multi-project scheduling using an heuristic and a genetic algorithm
    S. Kumanan
    G. Jegan Jose
    K. Raja
    The International Journal of Advanced Manufacturing Technology, 2006, 31 : 360 - 366
  • [44] A heuristic learning algorithm and its application to project scheduling problems
    Zamani, R
    Shue, LY
    Athanasiadis, L
    ASSOCIATION FOR INFORMATION SYSTEMS PROCEEDINGS OF THE AMERICAS CONFERENCE ON INFORMATION SYSTEMS, 1998, : 230 - 232
  • [45] The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
    Leyman, Pieter
    Van Driessche, Niels
    Vanhoucke, Mario
    De Causmaecker, Patrick
    COMPUTERS & OPERATIONS RESEARCH, 2019, 103 : 184 - 197
  • [46] Scheduling Markovian PERT networks to maximize the net present value
    Creemers, Stefan
    Leus, Roel
    Lambrecht, Marc
    OPERATIONS RESEARCH LETTERS, 2010, 38 (01) : 51 - 56
  • [47] THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS - COMMENT
    SEPIL, C
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 73 (01) : 185 - 187
  • [48] SCHEDULING A SINGLE-MACHINE TO MAXIMIZE NET PRESENT VALUE
    LAWRENCE, SR
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (06) : 1141 - 1160
  • [49] A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (07) : 1983 - 2001
  • [50] Scheduling the construction of value and discount weighted trees for maximum net present value
    Grossman, P. A.
    Brazil, M.
    Rubinstein, J. H.
    Thomas, D. A.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 115