A complex of mass concrete during the period of construction complex of constructional and technological measures for regulating temperature conditions and the thermal stressed state

被引:0
|
作者
Garkun, L.M.
Markin, L.I.
Kuz'min, K.K.
Pavlov, V.L.
机构
来源
关键词
Concrete dams;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:15 / 17
相关论文
共 9 条
  • [1] Temperature Control Measures and Temperature Stress of Mass Concrete during Construction Period in High-Altitude Regions
    Wang, Zhenhong
    Tao, Li
    Liu, Yi
    Jiang Yunhui
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [2] Study on Concrete's Temperature Control Measures for Inverted-Siphons during Construction Period
    Dong, Xiao-mei
    He, Yi
    Sun, Jing-chao
    MANUFACTURING SCIENCE AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 443-444 : 792 - +
  • [3] The Use of Surface Thermal Insulation to Regulate the Temperature Regime of a Mass Concrete During Construction
    Aniskin N.A.
    Chuc N.T.
    Khanh P.K.
    Power Technology and Engineering, 2021, 55 (01) : 1 - 7
  • [4] STUDY OF ACOUSTIC EMISSION DURING DEFORMATION OF ROCKS UNDER CONDITIONS OF A COMPLEX AXISYMMETRIC STRESSED STATE.
    Stavrogin, A.N.
    Zaretskii-Feoktistov, G.G.
    Tanov, G.N.
    Soviet mining science, 1986, 22 (05): : 341 - 350
  • [5] STUDY OF ACOUSTIC-EMISSION DURING DEFORMATION OF ROCKS UNDER CONDITIONS OF A COMPLEX AXISYMMETRICAL STRESSED STATE
    STAVROGIN, AN
    ZARETSKIIFEOKTISTOV, GG
    TANOV, GN
    SOVIET MINING SCIENCE USSR, 1986, 22 (05): : 341 - 350
  • [6] Dynamic Simulation Analysis of Temperature Field and Thermal Stress of Concrete Gravity Dam during Construction Period
    Wang, Haibo
    Qiang, Sheng
    Sun, Xiao
    Zheng, Rui
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2677 - 2681
  • [7] METHOD OF TESTING TUBULAR SPECIMENS OF POLYMER MATERIALS IN THE COMPLEX STRESSED STATE UNDER TEMPERATURE-EFFECT CONDITIONS.
    Aniskevich, N.I.
    Malmeister, A.A.
    Yanson, Yu.O.
    Mechanics of Composite Materials, 1984, 20 (01) : 118 - 122
  • [8] Effect of Accumulated Operating Time on Deformation and Failure of 12kh1MF Steel at the Temperature of 813K Under Complex Stressed State Conditions.
    Lamashevskii, V.P.
    Osasyuk, V.V.
    Makovetskii, I.V.
    Makovetskaya, I.A.
    Problemy Prochnosti, 1987, : 43 - 46
  • [9] Moisture Monitoring Data of Mass Timber Elements During Prolonged Construction Exposure: The Case of the Forest Science Complex (Peavy Hall) at Oregon State University
    Riggio, Mariapaola
    Schmidt, Evan
    Mustapha, Gamal
    FRONTIERS IN BUILT ENVIRONMENT, 2019, 5