共 50 条
- [42] A Practical Approach to Model a Cable with Nonlinear Material Characteristics 2021 IEEE 19TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (PEMC), 2021, : 637 - 643
- [43] ASSESSING THE CAPACITY OF A WIRE AND CABLE PLANT: A COMPREHENSIVE APPROACH. Wire Journal International, 1981, 14 (05): : 92 - 94
- [44] CONTINUOUS CAST-ROLLING PROCESS FOR MANUFACTURE OF PREDRAWING WIRE FOR PRODUCTION OF CABLE AND WIRE ROPE WIRE, 1970, (109): : 267 - &
- [46] Discrete Jaya algorithm based wire and cable production scheduling method Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4206 - 4214
- [47] Parameter optimization in the production of spring wire from sorbitized wire rod Steel Transl., 2007, 7 (648-650): : 648 - 650
- [49] A facility location approach to sensor placement optimization 8th Annual Water Distribution Systems Analysis Symposium 2006, 2007,
- [50] A Simulation Optimization Approach for Facility Layout Problem IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 734 - +