共 50 条
- [33] PECK DRILL CUTS HOLE COSTS FOR AEROSPACE ASSEMBLIES PRODUCTION ENGINEERING, 1983, 30 (10): : 14 - 15
- [37] Batch drilling program cuts time, costs for Liuhua development Oil and Gas Journal, 1996, 94 (33):
- [40] Development of Downlink Communication System for Steerable Drilling Application INTERNATIONAL CONFERENCE ON ADVANCES IN ENGINEERING 2011, 2011, 24 : 319 - 323