Trenchless alternative for gas main replacement

被引:0
|
作者
机构
来源
Pipeline and Gas Journal | 1997年 / 224卷 / 06期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Service replacement alternative
    No-Dig Int, 9 (14):
  • [42] Industry Perceptions of Alternative Project Delivery Methods Applied to Trenchless Pipeline Projects
    Francom, Tober
    Ariaratnam, Samuel T.
    El Asmar, Mounir
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2016, 7 (01)
  • [43] Effect of internal pressure on the flexural fatigue behaviour of trenchless internal replacement pipe systems
    Kiriella, Shanika
    Manalo, Allan
    Tien, Cam Minh Tri
    Ahmadi, Hamid
    Karunasena, Warna
    Dixon, Patrick G.
    Salah, Ahmad
    Wham, Brad P.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 154
  • [44] Development and application of trenchless magnetic detector for oil and gas pipeline defect
    Peng, He
    Gong, Jun-Min
    Song, Qiang
    Xiang, Xin-Sheng
    Shuai, Jian
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2021, 21 (01) : 163 - 174
  • [45] Pioneer 1.000mm water main trenchless rehab job in São Paulo
    Rodrigues, Lidemberg Antonio
    Rosas, Hélio
    Dantas, Diogo Sandoval
    30th International No-Dig Conference and Exhibition 2012, No-Dig Sao Paulo 2012, 2012, : 31 - 38
  • [46] Trenchless Construction Technologies for Oil and Gas Pipelines: State-of-the-Art Review
    Lu, Hongfang
    Behbahani, Saleh
    Azimi, Mohammadamin
    Matthews, John C.
    Han, Shuai
    Iseley, Tom
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (06)
  • [47] MWRA's Heath Hill water main rehabilitation project with the innovative use of trenchless technologies
    Pelletier, Michael
    Richardson, Peter A.
    Horbaczewski, Milan
    O'Brien, Kevin
    Journal of the New England Water Works Association, 2010, 124 (02) : 140 - 149
  • [48] Main topic: Cartilage replacement surgery
    Rudert, Maximilian
    OPERATIVE ORTHOPADIE UND TRAUMATOLOGIE, 2008, 20 (03): : 187 - 187
  • [49] ROYTON SOUTHERN MAIN SEWER REPLACEMENT
    不详
    WATER SERVICES, 1980, 84 (1011): : 297 - 297
  • [50] ANALYZING WATER MAIN REPLACEMENT POLICIES
    MALE, JW
    WALSKI, TM
    SLUTSKY, AH
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1990, 116 (03): : 362 - 374