共 50 条
- [31] Instructor station of Full Scope Simulator for Qiushan 300 MW Nuclear Power Unit Hedongli Gongcheng/Nuclear Power Engineering, 1996, 17 (02): : 129 - 125
- [32] An improvement on the feedwater regulation scheme for a 300 MW thermal power plant simulation unit 2001, Harbin Research Institute (16):
- [33] DESIGN AND PERFORMANCE TEST OF 300MW-UNIT POWER STATION IN A LIGNITE DISTRICT BRENNSTOFF-WARME-KRAFT, 1969, 21 (08): : 425 - &
- [34] Design of a test platform for simulating mechanical characteristic of LP-cylinder and condenser of a N300 MW turbine unit Qilunji Jishu/Turbine Technology, 2001, 43 (06):
- [38] Behavior of Zinc in the Water/Gas Route of 300 MW Power Units. Teploenergetika, 1975, (07): : 11 - 12
- [40] Performance of the full-scope simulator for Qinshan 300MW nuclear power unit Qinghua Daxue Xuebao, 12 (98-103):