共 32 条
- [11] An ice jam flood hazard assessment of a lowland river and its terminus inland delta Natural Hazards, 2021, 105 : 2799 - 2817
- [12] Study on genesis and forecast method of ice-jam flood for the upstream of Nenjiang River ICE IN SURFACE WATERS, VOL 2, 1999, : 747 - 751
- [16] STUDY OF COUNTER MEASURES FOR THE YELLOW-RIVER REGULATION AND FLOOD PREVENTION TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 289 - 298
- [17] STUDY ON AND ASSESSMENT OF FLOOD PREVENTION MEASURES ON THE LOWER YELLOW-RIVER TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 387 - 406
- [18] Evaluation of the implications of ice-jam flood mitigation measures (vol 2021, e12697, 2021) JOURNAL OF FLOOD RISK MANAGEMENT, 2021, 14 (04):
- [19] Ice-flood prevention in yellow river using GPR and unmanned helicopter Proc. IEEE Int. Conf. Commun. Softw. Networks, ICCSN, (23-28):