共 50 条
- [21] FLOODFLOW FORECASTING DURING DAM CONSTRUCTION. International Water Power and Dam Construction, 1984, 36 (05): : 15 - 17
- [22] Performance of the Robinson Slab During Construction. Bulletin de liaison des laboratoires des ponts et chaussees, 1984, (133): : 5 - 16
- [23] SMALL SIZE TELEPHONE SET DESIGN AND CONSTRUCTION. Review of the Electrical Communication Laboratories (Tokyo), 1974, 22 (3-4): : 221 - 226
- [26] SIMPLIFIED FRAME DESIGN OF TYPE PR CONSTRUCTION. Engineering Journal, 1987, 24 (04): : 141 - 146
- [27] IMMERSED TUBE TUNNELS: CONCEPT, DESIGN & CONSTRUCTION. Civil Engineering Practice, 1986, 1 (01): : 57 - 78
- [30] CHARTERED ENGINEERS RESPONSIBILITIES CME-CHARTERED MECHANICAL ENGINEER, 1987, 34 (03): : 14 - 14