BALANCE OF PLANT CONSIDERATIONS FOR LOAD-LEVELING BATTERIES.
被引:0
|
作者:
Abraham, J.
论文数: 0引用数: 0
h-index: 0
机构:
Public Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USAPublic Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USA
Abraham, J.
[1
]
Binas, G.
论文数: 0引用数: 0
h-index: 0
机构:
Public Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USAPublic Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USA
Binas, G.
[1
]
Del Monaco, J.L.
论文数: 0引用数: 0
h-index: 0
机构:
Public Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USAPublic Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USA
Del Monaco, J.L.
[1
]
Sharp, T.E.
论文数: 0引用数: 0
h-index: 0
机构:
Public Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USAPublic Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USA
Sharp, T.E.
[1
]
机构:
[1] Public Service Electric & Gas, Co, Newark, NJ, USA, Public Service Electric & Gas Co, Newark, NJ, USA
ELECTRIC BATTERIES;
SECONDARY - Energy Storage - ELECTRIC POWER PLANTS - Loads;
D O I:
暂无
中图分类号:
学科分类号:
摘要:
The authors present the major types of batteries being developed for load-leveling and a generic description of the balance of plant (BOP). The generic BOP description is used to define the components needed to integrate a load-leveling battery facility with an electric system. The BOP considerations for integrating a load-leveling battery with an electric system are described. The study is based on early data which the battery developers submitted and is generally for precommercial or developmental batteries.