共 50 条
- [21] New mountable equipment for arrangement of foundations in tamped trenches and for installation of cast-in-place piles in bored holes Osnovaniya, Fundamenty i Mekhanika Gruntov, 1994, (03): : 23 - 25
- [23] DESIGN OF LARGE DIAMETER CAST-IN-PLACE BORED PILES USING A 'PILOT' PILE AND CONGRUENCE EQUATIONS. Ground Engineering, 1981, 14 (04): : 27 - 33
- [26] Artificial Cooling of Cast-in-place Piles in Permafrost Regions Yu, Qi-Hao (yuqh@lzb.ac.cn), 1600, Chang'an University (33): : 104 - 114
- [27] Earth retention using augered cast-in-place piles AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 95 - 99
- [28] Bearing mechanism research for expansive cast-in-place piles Gongye Jianzhu/Industrial Construction, 1999, 29 (11): : 42 - 46
- [29] Quality control for installation of augered cast-in-place piles AUGERED CAST-IN-PLACE PILES: THE DEEP FOUNDATIONS INSTITUTES AUGERS CAST-IN-PLACE PILES COMMITTEE SPECIALTY SEMINAR, 1997, : 55 - 68