COST-TIME MODEL FOR LARGE CPM PROJECT NETWORKS

被引:0
|
作者
Panagiotakopoulos, Demetrios
机构
来源
| 1600年 / 103期
关键词
MANAGEMENT - Computer Applications - MATHEMATICAL MODELS;
D O I
暂无
中图分类号
学科分类号
摘要
A simple and efficient algorithm for hand computations or computer solutions is presented for developing cost-time trade-off curves for CPM project networks. The use of such curves, whose importance as project management tools increases with network size, has been hampered by two factors: the shape of cost-time relationships for the project's activities and the excessive computational costs for large networks. This algorithm is especially designed to cope with the above difficulties. All large engineering project networks can be decomposed into nonoverlapping segments so structured that their cost-time curve can be computed efficiently. Replacement of these segments by equivalent arcs drastically reduces the network either to a single arc, whose cost-time curve is the project-cost curve for the original network, or to a small nondecomposable form whereupon other existing schemes can be employed.
引用
收藏
相关论文
共 50 条
  • [31] SIMPLE CPM TIME-COST TRADEOFF ALGORITHM
    SIEMENS, N
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (06): : B354 - B363
  • [32] GENERALIZED CPM TIME COST TRADEOFF ALGORITHM.
    Goyal, S.K.
    Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1982, 62 : 135 - 138
  • [33] SIMPLE CPM TIME-COST TRADEOFF ALGORITHM
    GOYAL, SK
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (06): : 718 - 722
  • [34] COST AND TIME SCALED NETWORKS - GRAPHICAL MODEL
    SCHLICK, H
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (04): : 670 - 670
  • [35] COST AND TIME SCALED NETWORKS - GRAPHICAL MODEL
    BALAGURU, PN
    RAMAKRISHNAN, V
    NAAMAN, AE
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (02): : 179 - 190
  • [36] Integrated control of the project cost and schedule based on CPM by EVA and WBS
    Yan Hui
    Wang Yaowu
    Zhang Lei
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 431 - 433
  • [37] Calculating the theoretical project completion time of large networks in polynomial processing time
    Copertari, LF
    Archer, NP
    TECHNOLOGY MANAGEMENT IN THE KNOWLEDGE ERA, 2001, : 577 - 586
  • [38] Complexity of the discrete time-cost tradeoff problem for project networks
    De, P
    Dunne, EJ
    Ghosh, JB
    Wells, CE
    OPERATIONS RESEARCH, 1997, 45 (02) : 302 - 306
  • [39] Pareto optimal solutions of a cost-time trade-off bulk transportation problem
    Prakash, Satya
    Kumar, Pranav
    Prasad, B. V. N. S.
    Gupta, Anuj
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 188 (01) : 85 - 100
  • [40] Cost-time trade off models application to crashing flow shop scheduling problems
    Bagherpour, M
    Noori, S
    Sadjadi, SJ
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 546 - 553