共 50 条
- [31] SIMPLE CPM TIME-COST TRADEOFF ALGORITHM MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (06): : B354 - B363
- [32] GENERALIZED CPM TIME COST TRADEOFF ALGORITHM. Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1982, 62 : 135 - 138
- [33] SIMPLE CPM TIME-COST TRADEOFF ALGORITHM MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (06): : 718 - 722
- [34] COST AND TIME SCALED NETWORKS - GRAPHICAL MODEL JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (04): : 670 - 670
- [35] COST AND TIME SCALED NETWORKS - GRAPHICAL MODEL JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (02): : 179 - 190
- [36] Integrated control of the project cost and schedule based on CPM by EVA and WBS Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 431 - 433
- [37] Calculating the theoretical project completion time of large networks in polynomial processing time TECHNOLOGY MANAGEMENT IN THE KNOWLEDGE ERA, 2001, : 577 - 586
- [40] Cost-time trade off models application to crashing flow shop scheduling problems COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2006, PT 3, 2006, 3982 : 546 - 553