首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
ESTIMATING HYDRO STATION COSTS.
被引:0
|
作者
:
Gordon, J.L.
论文数:
0
引用数:
0
h-index:
0
Gordon, J.L.
机构
:
来源
:
International Water Power and Dam Construction
|
1982年
/ 33卷
/ 09期
关键词
:
Compilation and indexing terms;
Copyright 2025 Elsevier Inc;
D O I
:
暂无
中图分类号
:
学科分类号
:
摘要
:
MATHEMATICAL MODELS
引用
收藏
页码:31 / 33
相关论文
共 50 条
[41]
URANIUM MINE VENTILATION COSTS.
Bates, Robert C.
论文数:
0
引用数:
0
h-index:
0
Bates, Robert C.
Information Circular - United States, Bureau of Mines,
1981,
[42]
AUTOMATED PLANNING REDUCES COSTS.
Trusky, Harold T.
论文数:
0
引用数:
0
h-index:
0
Trusky, Harold T.
American machinist,
1984,
128
(04):
: 80
-
82
[43]
SMART TRANSMITTERS: JUSTIFYING THE COSTS.
Adamski, Robert S.
论文数:
0
引用数:
0
h-index:
0
Adamski, Robert S.
InTech,
1984,
31
(06)
: 63
-
64
[44]
ALKALINE PRECLEAN TO CUT COSTS.
Richards, James F.
论文数:
0
引用数:
0
h-index:
0
Richards, James F.
1600,
(08):
[45]
Red tape and housing costs.
Margulis, HL
论文数:
0
引用数:
0
h-index:
0
机构:
Cleveland State Univ, Cleveland, OH 44115 USA
Cleveland State Univ, Cleveland, OH 44115 USA
Margulis, HL
URBAN GEOGRAPHY,
2003,
24
(04)
: 357
-
359
[46]
CUSTOM LATHE CUTS COSTS.
SCHNEIDER, ROY
论文数:
0
引用数:
0
h-index:
0
SCHNEIDER, ROY
1982,
V 126
(N 11):
: 133
-
134
[47]
GAUGING TURNOUT PROBLEMS AND COSTS.
Anon
论文数:
0
引用数:
0
h-index:
0
Anon
Railway Track and Structures,
1988,
84
(02):
: 31
-
33
[48]
The refused help to save costs.
Keller, M.
论文数:
0
引用数:
0
h-index:
0
Keller, M.
WOCHENBLATT FUR PAPIERFABRIKATION,
2010,
138
(06):
: 501
-
503
[49]
Considerations on Spacelab Utilization Costs.
Seibert, Guenther
论文数:
0
引用数:
0
h-index:
0
Seibert, Guenther
Zeitschrift fuer Flugwissenschaften und Weltraumforschung,
1980,
4
(01):
: 1
-
6
[50]
ANALYSIS OF SHIPYARD PAINTING COSTS.
George, Daryl L.
论文数:
0
引用数:
0
h-index:
0
机构:
Peterson Builders Inc, Sturgeon Bay,, WI, USA, Peterson Builders Inc, Sturgeon Bay, WI, USA
Peterson Builders Inc, Sturgeon Bay,, WI, USA, Peterson Builders Inc, Sturgeon Bay, WI, USA
George, Daryl L.
1600,
(03):
←
1
2
3
4
5
→