Ground station resource scheduling optimization model and its heuristic algorithm

被引:0
|
作者
Jin, Guang
Wu, Xiao-Yue
Gao, Wei-Bin
机构
[1] Inst. of Systems Eng., Natl. Univ. of Defense Technol., Changsha 410073, China
[2] Astro. Res. and Devmt. Ctr. of Chief, Beijing 100094, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Ground station resource optimization problem is aimed at the determination of the number and distribution of equipment and the optimal scheduling for improving the efficiency of the equipment. A non-linear functional optimization model is established. Based on this model and the practical requirements, a 0-1 programming model is provided. In order to solve the 0-1 programming model, the conception of resource conflict is given, and according to conflict-resolving idea, a heuristic algorithm is proposed. At last a 5-station 10-satellite optimization problem is studied, and this algorithm is compared with a manual one. The conclusion is that the higher efficiency can be gained by this heuristic algorithm, which means that the service cycles per day are maintained with the increase of service time.
引用
收藏
页码:1839 / 1842
相关论文
共 50 条
  • [1] A heuristic dynamic optimization algorithm for irrigation scheduling
    Naadimuthu, G
    Raju, KS
    Lee, ES
    MATHEMATICAL AND COMPUTER MODELLING, 1999, 30 (7-8) : 169 - 183
  • [2] Heuristic algorithm for resource leveling problem in emergency scheduling
    Liang, Yan
    Jin, Ye
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2009, 15 (06): : 1165 - 1171
  • [3] Learnable ant colony optimization algorithm for solving satellite ground station scheduling problems
    Yao, Feng
    Xing, Li-Ning
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2012, 34 (11): : 2270 - 2274
  • [4] Optimizing satellite ground station facilities scheduling for RSGS: a novel model and algorithm
    Tian, Miaomiao
    Ma, Guangbin
    Huang, Peng
    Cheng, Bo
    Li, Wei
    INTERNATIONAL JOURNAL OF DIGITAL EARTH, 2023, 16 (01) : 3949 - 3972
  • [5] A Tabu Search Algorithm for Ground Station Scheduling Problem
    Xhafa, Fatos
    Herrero, Xavier
    Barolli, Admir
    Takizawa, Makoto
    2014 IEEE 28TH INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION NETWORKING AND APPLICATIONS (AINA), 2014, : 1033 - 1040
  • [6] A Simulated Annealing Algorithm for Ground Station Scheduling Problem
    Xhafa, Fatos
    Herrero, Xavier
    Barolli, Admir
    Takizawa, Makoto
    2013 16TH INTERNATIONAL CONFERENCE ON NETWORK-BASED INFORMATION SYSTEMS (NBIS 2013), 2013, : 24 - 30
  • [7] A Hybrid Genetic Algorithm for Ground Station Scheduling Problems
    Xu, Longzeng
    Yu, Changhong
    Wu, Bin
    Gao, Ming
    APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [8] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [9] Augmented heuristic algorithm for multi-skilled resource scheduling
    Wongwai, Narongrit
    Malaikrisanachalee, Suphawut
    AUTOMATION IN CONSTRUCTION, 2011, 20 (04) : 429 - 445
  • [10] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +