Microtunnelling

被引:0
|
作者
Wallis, Shani
机构
来源
Tunnels and Tunnelling | 1991年 / 23卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] MICROTUNNELLING DURING SELECTIVE ALLOY DISSOLUTION AND DURING PITTING.
    Kaesche, H.
    Werkstoffe und Korrosion, 1988, 39 (04): : 153 - 161
  • [42] Long-distance microtunnelling at Toronto Pearson International airport
    Ofori, Robert
    Schreiner, Jordan
    Gelinas, Marc
    Puri, Ajay
    Trisi, Walter
    Mulville, Joe
    Proceedings - Rapid Excavation and Tunneling Conference, 2017, 0 : 891 - 899
  • [43] A new system for the construction of large shallow tunnels by microtunnelling technology
    Grillo, L
    Alessandrini, F
    Meriggi, R
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2000, 15 : 43 - 58
  • [44] Numerical simulation of the creation and performance of extruded concrete linings in microtunnelling
    Royal, A. C. D.
    Hunt, D. V. L.
    Rogers, C. D. F.
    Chapman, D. N.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (06) : 745 - 753
  • [45] Record length microtunnelling drive using vitrified clay pipe
    No-Dig International, 1998, 9 (09):
  • [46] Experiences of utility microtunnelling in Irish limestone, mudstone and sandstone rock
    Sheil, Brian B.
    Curran, Brien G.
    McCabe, Bryan A.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 51 : 326 - 337
  • [47] Analysis of cylindrical microtunnelling working shaft, subjected to horizontal load
    Szajna, W. St.
    Malinowski, P.
    UNDERGROUND INFRASTRUCTURE OF URBAN AREAS 2, 2012, : 271 - 279
  • [48] Pipe-jacking and microtunnelling projects across Western Europe
    Tunn. Trenchless Constr., 2007, 28 (12-14):
  • [49] Field monitoring and instrumentation in microtunnelling/pipe jacking: A review and future directions
    Wadood, Asad
    Mccabe, Bryan A.
    Sheil, Brian B.
    UNDERGROUND SPACE, 2025, 22 : 225 - 240