共 50 条
- [21] Construction control of 500 m scale concrete-filled steel tubular arch bridge Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2015, 50 (04): : 635 - 640
- [23] Influences of debonding on mechanical behavior of trussed concrete-filled steel tubular arch bridge Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2007, 20 (06): : 61 - 66
- [24] Simulation analysis for mechanic behavior of concrete-filled steel tubular arch bridge during the course of core concrete pumping Gongcheng Lixue, 2007, 2 (146-153):
- [25] Development of concrete-filled tubular arch bridges, China Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2001, 11 (04): : 265 - 267
- [27] Dynamic Analysis of Xiying Concrete Filled Steel Tubular Arch Bridge 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 738 - 742
- [28] Research on Dynamic Performance of Concrete-filled Steel Tubular Trussed Arch Bridge under Earthquake ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 1222 - +
- [29] The optimization of cable tensions for a cable-stayed concrete-filled steel tubular arch bridge STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 326 - 331
- [30] Creep performance of concrete-filled steel tubular (CFST) columns and applications to a CFST arch bridge STEEL AND COMPOSITE STRUCTURES, 2015, 19 (01): : 111 - 129