共 50 条
- [31] MAJOR FACTORS IMPEDING THE IMPLEMENTATION OF WASTE MANAGEMENT IN AUSTRALIAN CONSTRUCTION PROJECTS JOURNAL OF GREEN BUILDING, 2018, 13 (03): : 101 - 121
- [36] Disturbance Controlling during Construction Period - Conflict Management in Major Construction Projects with regard to Planning- and Construction Disturbances BAUINGENIEUR, 2017, 92 : 392 - 397
- [37] The Forest Insurance System Construction of Northeast Major Forest Ecological Function Areas PROCEEDINGS OF THE 2012 INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION AND PUBLIC POLICY (ICMIPP 2012), VOLS 1-6, 2012, : 1895 - 1899
- [38] Selection criteria used for the choice of contract type for major highway construction projects TRANSPORT RESEARCH ARENA 2012, 2012, 48 : 3508 - 3517
- [39] ADOPTION OF SIMULATION TECHNIQUES FOR MASTERING LOGISTIC COMPLEXITY OF MAJOR CONSTRUCTION AND ENGINEERING PROJECTS PROCEEDINGS OF THE 24TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2010, 2010, : 160 - +
- [40] Researches on the Construction of Information Support System for Major and Key Military Transportation Projects COMPUTER AND INFORMATION TECHNOLOGY, 2014, 519-520 : 1431 - +