SILENCING TECHNIQUES FOR GAS TURBINE DRIVEN COMPRESSOR SETS FOR PIPE-LINE INSTALLATIONS.

被引:0
|
作者
Hood, W.C.
机构
来源
关键词
PIPELINES - Compressor Stations;
D O I
暂无
中图分类号
学科分类号
摘要
The article discusses such techniques for an industrial gas turbine compressor set housed in an individual weatherproof acoustic enclosure. In the U. K. the majority of gas turbines used for this application have been of the aero-derived type, but the silencing and mechanical design problems are virtually identical to that of the industrial type of engine. A further variable is a site where, for reasons of economics and maintenance, multiple units are housed in a single building, normally constructed of concrete or a similar material. Among the points covered are noise from the gas turbine intake, exhaust and casing, from the driven unit, accessory package, acoustic enclosure ventilation, pipe work, oil cooler and filter.
引用
收藏
页码:249 / 251
相关论文
共 50 条
  • [41] ON-LINE COMPRESSOR CASCADE WASHING FOR GAS TURBINE PERFORMANCE INVESTIGATION
    Igie, Uyioghosa
    Pilidis, Pericles
    Fouflias, Dimitrios
    Ramsden, Ken
    Lambart, Paul
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 4, 2012, : 221 - 231
  • [42] Gas turbine compressor fouling. The case for on-line cleaning
    [J]. McDermott, Peter E., 1600, (32):
  • [43] Accounting of non-uniform distribution of emergency factors in length of gas pipe-line in reliability problems
    Ikusov, A.E.
    Shibnev, A.V.
    [J]. Gazovaya Promyshlennost, 2001, (03): : 22 - 25
  • [44] DESIGN OF GAS-TURBINE-DRIVEN COMPRESSOR AND PUMP MODULES FOR OFFSHORE PRODUCTION
    STEFFEN, PW
    DARE, RT
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1974, 26 (MAR): : 302 - 302
  • [45] Measurement uncertainties encountered during gas turbine driven compressor field testing
    Brun, K
    Kurz, R
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2001, 123 (01): : 62 - 69
  • [46] COMPETITION HELD DOWN GAS PIPE-LINE BUILDING COSTS FOR 2ND QUARTER OF 1983
    MORGAN, JM
    [J]. OIL & GAS JOURNAL, 1984, 82 (15) : 92 - 94
  • [48] GAS TURBINE OPERATION OFFSHORE; ON-LINE COMPRESSOR WASH OPERATIONAL EXPERIENCE
    Madsen, Stian
    Bakken, Lars E.
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 3B, 2014,
  • [49] SIMULATION AND EXPERIMENTAL STUDY OF BURIED NATURAL GAS PIPE-LINE LEAK DETECTION BASED ON SOUND SOURCE CHARACTERISTICS
    Lin, Ting
    Wang, Zhichi
    Hu, Bin
    Ji, Yubo
    Liang, Xiaoyu
    [J]. THERMAL SCIENCE, 2024, 28 (1A): : 101 - 113
  • [50] Improving GPA-Ts turbine-driven compressor units for compressor plants of the gas and oil industry
    V. E. Sukhinenko
    V. N. Dovzhenko
    V. P. Parafeinik
    V. P. Klisenko
    A. V. Kanaev
    V. N. Orlov
    I. V. Bartsev
    [J]. Chemical and Petroleum Engineering, 1997, 33 : 467 - 474