New constraint-based approach for overhaul project scheduling with work space constraints

被引:0
|
作者
机构
来源
Int J Ind Eng Theory Appl Pract | / 2卷 / 123-131期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] A new constraint-based approach for overhaul project scheduling with work space constraints
    Gharbi, A
    Pellerin, R
    Villeneuve, L
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 1999, 6 (02): : 123 - 131
  • [2] Scheduling of maintenance work: A constraint-based approach
    Palma, J.
    de Leon Hijes, F. C. Gomez
    Campos Martinez, M.
    Guillen Carceles, L.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (04) : 2963 - 2973
  • [3] A LOCAL CONSTRAINT-BASED ANALYSIS APPROACH TO PROJECT SCHEDULING UNDER GENERAL RESOURCE CONSTRAINTS
    OZDAMAR, L
    ULUSOY, G
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 79 (02) : 287 - 298
  • [4] Constraint-based database for work package scheduling
    Choo, HJ
    Tommelein, ID
    Ballard, G
    Zabelle, TR
    [J]. COMPUTING IN CIVIL ENGINEERING, 1998, : 169 - 180
  • [5] A CONSTRAINT-BASED PERSPECTIVE IN RESOURCE CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) : 693 - 705
  • [6] A constraint-based method for project scheduling with time windows
    Cesta, A
    Oddi, A
    Smith, SF
    [J]. JOURNAL OF HEURISTICS, 2002, 8 (01) : 109 - 136
  • [7] A Constraint-Based Method for Project Scheduling with Time Windows
    Amedeo Cesta
    Angelo Oddi
    Stephen F. Smith
    [J]. Journal of Heuristics, 2002, 8 : 109 - 136
  • [8] Constraint-based scheduling
    Fromherz, MPJ
    [J]. PROCEEDINGS OF THE 2001 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2001, : 3231 - 3244
  • [9] WorkPlan: Constraint-based database for work package scheduling
    Choo, HJ
    Tommelein, ID
    Ballard, G
    Zabelle, TR
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (03) : 151 - 160
  • [10] A Constraint-based Approach to Multiphase Project Planning
    Mali, Amol D.
    [J]. 2016 IEEE 28TH INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE (ICTAI 2016), 2016, : 460 - 463